OEM Experience

Category
portfolio
About This Project

General Motors:

  • Developed a systems procedure for processing schematic changes which reduced wiring errors by 20%. GM implemented the procedure globally.
  • Implemented new global drawing release system during a high volume launch

Yazaki North America

  • Developed and implemented new drawing release timing system for multiple carlines which provided a structure that allowed each Business Unit Team to meet all releases on-time.
  • Improved Change Control process by creating a verification method to identify design errors before manufactured.

Piston Automotive:

  • Initiated and Championed Gate Review framework. This structure streamlined all the deliverables required from each internal department customized to customer timing.
  • Developed Battery Warranty process which improved assembly and delivery requirement.
  • Advised and supported new automated supply chain system for Battery products which improved harmony and accounting between key departments

Chrysler:

  • Awarded recognition for highest cost reduction effort for Minivan platform
  • Tech Award for creative design proposals for Electrical Power Distribution Systems

Honda:

  • Implemented Validation Events for Strut Modules Assemblies